When building WIN Tasks in the OnPlan Builder there is a requirement to select a Task Type. The task types in the Builder software not only reflect the type of maintenance being done but can also dictate the output from the software. i.e. a PM (service) type task document may require a check sheet style document where the format format for a CC (Remove and Install) document may have lots of images and notes and require a different format.
The look and feel of the output is configured in the Output Template. Standard default system task types provided include:
Task | Task Description |
AD | Adjust |
CC | Remove and Install |
GR | General Repair |
HC | Hose Remove and Install |
IN | Inspect |
PM | Perform (PM Service) |
SI | Structural Inspection |
TT | Test |
See your Account Manager if additional task types are required.